News
18.December.2025
#WP03

Fieldwork with Local Action Groups under WP03

We are concluding the publication of the fieldwork carried out with Local Action Groups as part of Work Package 03 (WP03). This work package has focused on analyzing social cohesion and the socio-ecological characteristics of territories crossed by low-traffic railway lines.

On July 3, 2025, we conducted a comprehensive session in Aguilar de Campoo, working alongside the following Local Action Groups:

  • CENTRO DE DESARROLLO RURAL MERINDADES (Burgos) (https://cedermerindades.com )
  • and Rosario Gómez Osorio, presidenta Asociación Leonesa del Camino Olvidado 

On July 3, 2025, we conducted a comprehensive session in Aguilar de Campoo, working alongside Local Action Groups

The discussions focused on railway lines 790: La Calzada – Guardo, 792: La Robla – Matallana, and 130: La Robla – Puente de los Fierros. These territories have a strong historical connection to the railway, and our analysis highlights the need to preserve and enhance their territorial heritage.

We invite you to explore the insights from this session and join us in valuing the cultural and socio-ecological richness of these regions.